Please fill out prior to leaving site
We confirm that the project has been installed inline with current SEMA guidelines. The team supervisor must check prior to the handover of the project: That there is no visable damage to any item or component That the rack / floor / partitioning is level. That all baseplates are secured down to the floor slab with the correct fixings. That the racking / shelving / floor system / partitioning has been built inline with all design information supplied That the racking / shelving / partitioning / floor system has been installed inline with SEIRS and SEMA / British Standards guidelines